LG Optimus 2X (P990)

My Handheld

Hatsune Miku

News and music

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Showing posts with label daily. Show all posts
Showing posts with label daily. Show all posts

Monday, October 8, 2012

20121008

Copying spot data to extrnal drive

20121005

Meeting about service in little garden

20121004

Preparring some quicklook for landsat data.  Take 2 6TB external drive from warehouse

Tuesday, October 2, 2012

20121001

New month already,guess too much stop last month,the log is stopped at the middle of the month but the monthly report is okay in the end coz there's training on the last week of sept.
For the beginning of the month just being lazy in the morning.
But after lunch break everything start to roll. Start with wake up phone call to help friend with some auto reproject,then meeting about spp service for friday meeting. And b4 reach the upstair room,meet the boss and ask to accompany people setting up blade server till afternoonn

Friday, September 14, 2012

20120913

Not doing much,just finished copy 06 folder,but do some mistakes on it so its overlap or overwrite with 07 folders. And finishing copy data in share jica with bash file

20120912

The backup process of "05" n "07" folder is done. After that they need to be copied in the big server.
There is a strange behaviour on the cluster. Each time its geowarping,3rd sw,it goes on loop, wont finished. Maybe need to try build from scratch.
Oh,and copying some of the mosaic fldr to jica staff. Its needed after disscussion with modis admin and he gave a space and established a link to NAS drive where the files will be placed

Wednesday, September 12, 2012

20120911

Making batch for extraction once again but now in USB drive in the morning. The person to fix server disk drive is arrived at the afternoon. And bcoz the fre space is almost up,need backing up some files,"07" folder is chosen. The USB with "05" and "07" folders need to copied to the bigger server. Start with "05"

20120910

The CSIRO's person is here again. Discussing about what to backup and realize that the new "geowarp.in" file is sent by email and i missed it. Then I try to run the 2 folders again with new file. It run but take long time(?).
Make an FTP that can be shared by people with IP public with modis admin. Then  must copy the class data to there.

20120907

All I can remember is there's some problem with the OS in the server. Some files corrupted maybe bcoz the internal hard drive which used as a backup (RAID 1) has trouble. And some blinking in on one of the storage drive. The operator came in the evening so stayed in the office till dawn is needed.
Maybe some extraction of 2012 LS data was started at noon. Make batch with delay. The delay is made by doing some ping count with "-n" parameter

20120906

~Ditching to "Red Land"~

Friday, September 7, 2012

20120905

Still with JICA staff today,he has bought is*t simcard with 2x100rb and telk simcard with 2x100rb. I'm suggesting is*t bcoz IMHO it has longer active time and the active time will be extended if u adding pulse. But after googling,I found this site and found that axis is having more merit in lifetime,it could expand till 2 years,but is*t limiting a sim card lifetime only for 90 days. But bcoz he needs stability maybe it's not bad to suggest is*t.
As for the backup progress,the Pap and Sum has finished,that conclude the "05" folder. And continued to "07" folder. The batch is not hard to completed then run it before noon. And while running the 2nd batch,doing integrity checking of the backup archive. Just 1 folder missed and it was fixed directly.
the JICA's staff ask to copying some mosaic data and I gave him 2008-2009 from every folders from cluster server. And he asked me to make port he can accessed from the cluster containing that data

20120904

Finally able to make a batch for making backup as an archive. Using this site as a reference on winrar command. Starting batch backup for Pap on the noon. The Sul list and batch already finished though. after I'm sure that the time would be enough to finished all of them on the next day. The Sul batch job was start on the evening.

Wednesday, September 5, 2012

20120903

Not even able to write August report bcoz so many happened from the morning. There's a invitation about paper,but I'm able to dodge it,thx to the head section inform me to accompany JICA's staff to do something about server. And in the morning there's a fuss about Nas02,the indicator lamp blinking,made us worries if there's something wrong with the disk and will lead to broken data. That's why we commanded to make a backup first,in case something happened. So I start with informing technical team to not make change in the directory that we plan on making backup,so the backup is the last state. Then making list of all the files and folders on the "05\pap\sul" and "07" directory. Then The guest is arrived.
The agenda is to insert some kal mos landsat data. 4 images,for 1990 and 2011, each was zone 49,50
And there's SMS server that came in the afternoon. It needs time finding out how to send SMS using command line.
That's all,but it takes almost and work day

Friday, August 31, 2012

20120831

Link for today
http://underpantsu.blog.com/read/news/228/hatsune-miku-updated-details-5th-birthday-best-memories-impacts-%E2%80%93anniversary-albums/


http://www.kaskus.co.id/showpost.php?p=563637623&postcount=4158

http://myblogistoshare.blogspot.com/2012/08/konser-ini-menampilkan-hatsune-miku.html#more


G young link
http://forum.xda-developers.com/showthread.php?t=1767363

http://www.kaskus.co.id/showpost.php?p=402830856&postcount=9008

http://www.kaorinusantara.web.id/forum/showthread.php?t=20821


Today i'm too exited flashing my Galaxy Young. It's my previous HH before using O2x. It smashed (my hand actually do the thing :p ) and the LCD broken. Something happened and we decided to repair it and after 2 days it's back to operational. Now I'm back to flash some ROM again.

Thursday, August 30, 2012

20120830

Even I'm starting to have idea what I wanna do with this blog,it wont came out  easily,bcoz everything just crossing in and jumping out. But for today what I'm really gonna noted is THIS-GREAT-NEWS(or I HOPE this will leaing to A-REALLY-GREAT_NEWS) from XDA. Some people on LG Optimus community in FB spreads that news and made me watch the news development in XDA forum. It was news of SU660(korean ver of P990) has received ICS update. The news struck every member of O2X community in XDA to play with that ROM or just sound there optimism not long again it will be our P990 to get the ICS update (finally after a year) although I'm just starting using mine for last 2 months. But it makes me really sure it will come true in near future.

Link for today is
http://www.exilon-music.com/2012/08/single-hatsune-miku-odds-ends.html#third --Wow...ODDS and ENDS Single from ryo(supercell)
http://tulisaniwenk.blogspot.com/2011/12/download-crack-adobe-photoshop-cs3.html bcoz my file is deleted by antivirus >.<

And forget to make link in banner,so here its adding "/search/label/(label)"

Beside watching news progress,I've done something like this
-Copying new hires data
-Help fixing some feature in browse katalog





As for another idea is about deco27,ryo,miku,and tomorrow is Hatsune Miku birthday....

Wednesday, August 29, 2012

20120829

Copying data from boston

20120828

Copying results from Class process and give it to QA person...

Using rainmeter and docklet...not very hard...but not too good result

Monday, August 13, 2012

20120813

Making some screen-capture for the semester report. Must do some chmod to make the files executable. There's 10 machines that came from iafcp maybe...not sure about it but it's already handled by the head of administration.
Make progress for making the "class",copying 3 more directories to headnote and run 2 first program on 49n_cw. They runs successfully.


20120808-20120811

4 days Ritek in bandung...

20120807

It's for tuesday log,what i can remember is just preparing for some trip to bandung for 4 days to do some exhibition. Everything is already set by the head office so we just have to go there. There's an email stated that the process for the error directory is done successfully so that' mean there's something inour cluster. Give some more info by email and that's it,wait for answer....